Introducing a truly professional WordPress theme built to last! We developed Wilmër for all construction & architecture sites.

Mon - Sat 8:00 - 17:30,
Sunday - CLOSED
 

Adano Verifiable Project Experience

YEAR PROJECT DESCRIPTION PROJECT CLIENT PROJECT LOCATION PROJECT STATUS
2023 ENGINEERING, PROCUREMENT, CONSTRUCTION AND INSTALLATION OF EIGHT (8NOS) STORAGE TANKS, 60,000 B/D WATER TREATMENT PLANT AND WATER INJECTION LINE AT UGHELLI EAST FOR THE PRODUCED WATER HANDLING PROJECT FOR OML 34 NNPC EXPLORATION AND PRODUCTION LIMITED/ND WESTERN OML 34 UGHELLI EAST ONGOING
2023 MECHANICAL PIPING, CIVIL & STRUCTURAL ENGINEERING WORKSIN RESPECT OF 12-INCH PIPELINE RECOMMISSIONING ARDOVA PLC AP-CONOIL ROAD, IJORA, APAPA, LAGOS STATE ONGOING
2023 SUPPLY AND INSTALLATION OF VACONO DOME AND IFR FOR TANK 2 IN OVH TERMINAL 1 OVH ENERGY MARKETING COMPANY LIMITED MARINE BEACH, APAPA LAGOS COMPLETED
2022 SUPPLY AND INSTALLATION OF VACONO ACCESSORIES AND PIPING WORKS FOR TANK 4 AT TERMINAL 1. OVH ENERGY MARKETING COMPANY LIMITED MARINE BEACH, APAPA LAGOS COMPLETED
2020 Emergency Rehabilitation Of Burnt Loading Gantry At Ibadan Depot Nigerian Pipeline And Storage Company(NPSC)/NNPC Ibadan Depot, Oyo State Ongoing
Year Project Description Project Client Project Location Project Status
2020 The Construction of Truck Parking Area (Piping Works) At OVH Terminal 1 – Apapa Lagos OVH Energy Marketing Company Limited Marine Beach, Apapa Lagos Completed
2020 ASPM 16″ Pipeline Modification For Ago Receipt To OVH/Total JV Depot At OVH Terminal 1 & OVH/Total JV Depot-Apapa Lagos. OVH Energy Marketing Company Limited/TOTAL JV Marine Beach, Apapa Lagos Completed
2019 Rehabilitation Of PMS Tank 32 at Atlas cove Depot Nigerian Pipeline And Storage Company(NPSC)/NNPC Atlas Cove Depot, Lagos State Ongoing
2019 Construction Of ASPM Pipeline Pressure Relief  System At Apapa Terminal 1 OVH Energy Marketing Company Limited Marine Beach, Apapa Lagos Completed
2019 Rehabilitation Of PMS Tank 31 at Atlas cove Depot Nigerian Pipeline And Storage Company(NPSC)/NNPC Atlas Cove Depot, Lagos State Ongoing
2018 2021 Operation And Maintenance of Apapa Jetty and Mosimi Depot  Nigerian Pipeline And Storage Company(NPSC)/NNPC NNPC Apapa Jetty, Lagos State and Mosimi Depot, Ogun State Completed
2018 Rehabilitation of PMS Floating Roof Tanks 15 & 16 And Fixed Roof Slop Tanks 71 & 72 at Mosimi Depot Nigerian Pipeline And Storage Company(NPSC)/NNPC NNPC – PPMC Depot Mosimi, Ogun State Ongoing
Year Project Description Project Client Project Location Project Status
2011 Emergency Inspection & Refurbishment of Forcados Terminal Tanks 201 & 206 – NGO1009272 Shell Petroleum Development Company Of Nigeria Shell – Forcados Terminal, Delta State completed
2011 Demolition of Skim Tanks A & B And Old UQCC Facilities at UPS (UQCC) Station, Ughelli – W13216 Shell Petroleum Development Company Of Nigeria Shell UPS (UQCC) Delta State Completed
2010 Emergency Quick Fix of Tank 17 Shell Petroleum Development Company Of Nigeria Shell Terminal, Bonny Island, Rivers State Completed
2009 Emergency Quick Fix of Tank 16 Shell Petroleum Development Company Of Nigeria Shell Terminal, Bonny Island, Rivers State Completed
2007 Rehabilitation of Ups (UQCC) Crude Storage Tanks –W13216 Shell Petroleum Development Company Shell UPS (UQCC) Delta State Completed
2007 Replacement Of 36″ Gate Valve On Crude Oil Storage Tank 170 Shell Petroleum Development Company Of Nigeria Shell Terminal, Bonny Island, Rivers State Completed
2007 Emergency Quick Fix, Nozzle And Stilling Well Installation On Tanks 11 & 13 – E09189-V08 (Adano) Shell Petroleum Development Company Of Nigeria Shell Terminal, Bonny Island, Rivers State Completed
2007 Rehabilitation of Bonny Tanks 11, 12, 13 & 20 Shell Petroleum Development Company Shell Terminal, Bonny Completed
Year Project Description Project Client Project Location Project Status
2006 Ughelli Pump Station Repair And Upgrade, Ughelli, Delta State Shell Petroleum Development Company Of Nigeria Ughelli, Delta State completed
2006 Emergency Quick Fix, Nozzle And Stilling Well Installation On Tank 20 – E09189-V08 (Adano) Shell Petroleum Development Company Of Nigeria Bonny Island, Rivers State Completed
2006 Bonny Natural Gas Shut Down And Turn Around Maintenance – Eh8472 Shell Petroleum Development Company Shell Terminal, Bonny Island, Rivers State Completed
2005 CPI/ISF Modification Shell Petroleum Development Company Of Nigeria Shell Terminal, Bonny Island, Rivers State Completed
2004 Tanks 3304 A&B Erection Shell Petroleum Development Company BTIP Shell Bonny Island, Rivers State Completed
2004 Tanks 3305 A&B Erection Hyundai Heavy Industries BTIP Shell Bonny Island, Rivers State Completed
2004 Bonny Terminal Fire Water Ring Main (Pipeline) Repair Project Hyundai Heavy Industries BTIP Shell Bonny Island, Rivers State Completed
2004 Tank 1401 Erection Hyundai Heavy Industries BTIP Shell Bonny Island, Rivers State Completed
2004 Tank 1201A&B Erection Hyundai Heavy Industries BTIP Shell Bonny Island, Rivers State Completed
Year Project Description Project Client Project Location Project Status
2004 Tank 1203, 1601 A&B Erection Hyundai Heavy Industries BTIP Shell Bonny Island, Rivers State Completed
2003 Tank 601A foundation Construction Hyundai Heavy Industries BTIP Shell Bonny Island, Rivers State Completed
2003 Tank 601A, 7201A&B Erection Hyundai Heavy Industries BTIP Shell Bonny Island, Rivers State Completed
2001 Degassing and Desludging of Tank 15 E-12279 Shell Petroleum Development Company Of Nigeria BTIP Shell Bonny Island, Rivers State Completed
2000 Emergency Repair on Tank 5 E-11151 Shell Petroleum Development Company Of Nigeria BOGT Shell Bonny Island, Rivers State Completed
2000 Emergency repair on Tanks 9 & 22 E-11151 Shell Petroleum Development Company Of Nigeria BOGT Shell Bonny Island, Rivers State Completed
1998 Tank Repair, Blasting & Painting Sirpi-Alusteel BOGT Shell Bonny Island, Rivers State Completed
1998 Tank Repair and Maintenance on Gas Plant NAOC Kwale Completed
1997 Repair of Weld Failure on FCC Unit Port Harcourt Refinery Port Harcourt, River State Completed