YEAR | PROJECT DESCRIPTION | PROJECT CLIENT | PROJECT LOCATION | PROJECT STATUS |
---|---|---|---|---|
2023 | ENGINEERING, PROCUREMENT, CONSTRUCTION AND INSTALLATION OF EIGHT (8NOS) STORAGE TANKS, 60,000 B/D WATER TREATMENT PLANT AND WATER INJECTION LINE AT UGHELLI EAST FOR THE PRODUCED WATER HANDLING PROJECT FOR OML 34 | NNPC EXPLORATION AND PRODUCTION LIMITED/ND WESTERN | OML 34 UGHELLI EAST | ONGOING |
2023 | MECHANICAL PIPING, CIVIL & STRUCTURAL ENGINEERING WORKSIN RESPECT OF 12-INCH PIPELINE RECOMMISSIONING | ARDOVA PLC | AP-CONOIL ROAD, IJORA, APAPA, LAGOS STATE | ONGOING |
2023 | SUPPLY AND INSTALLATION OF VACONO DOME AND IFR FOR TANK 2 IN OVH TERMINAL 1 | OVH ENERGY MARKETING COMPANY LIMITED | MARINE BEACH, APAPA LAGOS | COMPLETED |
2022 | SUPPLY AND INSTALLATION OF VACONO ACCESSORIES AND PIPING WORKS FOR TANK 4 AT TERMINAL 1. | OVH ENERGY MARKETING COMPANY LIMITED | MARINE BEACH, APAPA LAGOS | COMPLETED |
2020 | Emergency Rehabilitation Of Burnt Loading Gantry At Ibadan Depot | Nigerian Pipeline And Storage Company(NPSC)/NNPC | Ibadan Depot, Oyo State | Ongoing |
Year | Project Description | Project Client | Project Location | Project Status |
2020 | The Construction of Truck Parking Area (Piping Works) At OVH Terminal 1 – Apapa Lagos | OVH Energy Marketing Company Limited | Marine Beach, Apapa Lagos | Completed |
2020 | ASPM 16″ Pipeline Modification For Ago Receipt To OVH/Total JV Depot At OVH Terminal 1 & OVH/Total JV Depot-Apapa Lagos. | OVH Energy Marketing Company Limited/TOTAL JV | Marine Beach, Apapa Lagos | Completed |
2019 | Rehabilitation Of PMS Tank 32 at Atlas cove Depot | Nigerian Pipeline And Storage Company(NPSC)/NNPC | Atlas Cove Depot, Lagos State | Ongoing |
2019 | Construction Of ASPM Pipeline Pressure Relief System At Apapa Terminal 1 | OVH Energy Marketing Company Limited | Marine Beach, Apapa Lagos | Completed |
2019 | Rehabilitation Of PMS Tank 31 at Atlas cove Depot | Nigerian Pipeline And Storage Company(NPSC)/NNPC | Atlas Cove Depot, Lagos State | Ongoing |
2018 2021 | Operation And Maintenance of Apapa Jetty and Mosimi Depot | Nigerian Pipeline And Storage Company(NPSC)/NNPC | NNPC Apapa Jetty, Lagos State and Mosimi Depot, Ogun State | Completed |
2018 | Rehabilitation of PMS Floating Roof Tanks 15 & 16 And Fixed Roof Slop Tanks 71 & 72 at Mosimi Depot | Nigerian Pipeline And Storage Company(NPSC)/NNPC | NNPC – PPMC Depot Mosimi, Ogun State | Ongoing |
Year | Project Description | Project Client | Project Location | Project Status |
2011 | Emergency Inspection & Refurbishment of Forcados Terminal Tanks 201 & 206 – NGO1009272 | Shell Petroleum Development Company Of Nigeria | Shell – Forcados Terminal, Delta State | completed |
2011 | Demolition of Skim Tanks A & B And Old UQCC Facilities at UPS (UQCC) Station, Ughelli – W13216 | Shell Petroleum Development Company Of Nigeria | Shell UPS (UQCC) Delta State | Completed |
2010 | Emergency Quick Fix of Tank 17 | Shell Petroleum Development Company Of Nigeria | Shell Terminal, Bonny Island, Rivers State | Completed |
2009 | Emergency Quick Fix of Tank 16 | Shell Petroleum Development Company Of Nigeria | Shell Terminal, Bonny Island, Rivers State | Completed |
2007 | Rehabilitation of Ups (UQCC) Crude Storage Tanks –W13216 | Shell Petroleum Development Company | Shell UPS (UQCC) Delta State | Completed |
2007 | Replacement Of 36″ Gate Valve On Crude Oil Storage Tank 170 | Shell Petroleum Development Company Of Nigeria | Shell Terminal, Bonny Island, Rivers State | Completed |
2007 | Emergency Quick Fix, Nozzle And Stilling Well Installation On Tanks 11 & 13 – E09189-V08 (Adano) | Shell Petroleum Development Company Of Nigeria | Shell Terminal, Bonny Island, Rivers State | Completed |
2007 | Rehabilitation of Bonny Tanks 11, 12, 13 & 20 | Shell Petroleum Development Company | Shell Terminal, Bonny | Completed |
Year | Project Description | Project Client | Project Location | Project Status |
2006 | Ughelli Pump Station Repair And Upgrade, Ughelli, Delta State | Shell Petroleum Development Company Of Nigeria | Ughelli, Delta State | completed |
2006 | Emergency Quick Fix, Nozzle And Stilling Well Installation On Tank 20 – E09189-V08 (Adano) | Shell Petroleum Development Company Of Nigeria | Bonny Island, Rivers State | Completed |
2006 | Bonny Natural Gas Shut Down And Turn Around Maintenance – Eh8472 | Shell Petroleum Development Company | Shell Terminal, Bonny Island, Rivers State | Completed |
2005 | CPI/ISF Modification | Shell Petroleum Development Company Of Nigeria | Shell Terminal, Bonny Island, Rivers State | Completed |
2004 | Tanks 3304 A&B Erection | Shell Petroleum Development Company | BTIP Shell Bonny Island, Rivers State | Completed |
2004 | Tanks 3305 A&B Erection | Hyundai Heavy Industries | BTIP Shell Bonny Island, Rivers State | Completed |
2004 | Bonny Terminal Fire Water Ring Main (Pipeline) Repair Project | Hyundai Heavy Industries | BTIP Shell Bonny Island, Rivers State | Completed |
2004 | Tank 1401 Erection | Hyundai Heavy Industries | BTIP Shell Bonny Island, Rivers State | Completed |
2004 | Tank 1201A&B Erection | Hyundai Heavy Industries | BTIP Shell Bonny Island, Rivers State | Completed |
Year | Project Description | Project Client | Project Location | Project Status |
2004 | Tank 1203, 1601 A&B Erection | Hyundai Heavy Industries | BTIP Shell Bonny Island, Rivers State | Completed |
2003 | Tank 601A foundation Construction | Hyundai Heavy Industries | BTIP Shell Bonny Island, Rivers State | Completed |
2003 | Tank 601A, 7201A&B Erection | Hyundai Heavy Industries | BTIP Shell Bonny Island, Rivers State | Completed |
2001 | Degassing and Desludging of Tank 15 E-12279 | Shell Petroleum Development Company Of Nigeria | BTIP Shell Bonny Island, Rivers State | Completed |
2000 | Emergency Repair on Tank 5 E-11151 | Shell Petroleum Development Company Of Nigeria | BOGT Shell Bonny Island, Rivers State | Completed |
2000 | Emergency repair on Tanks 9 & 22 E-11151 | Shell Petroleum Development Company Of Nigeria | BOGT Shell Bonny Island, Rivers State | Completed |
1998 | Tank Repair, Blasting & Painting | Sirpi-Alusteel | BOGT Shell Bonny Island, Rivers State | Completed |
1998 | Tank Repair and Maintenance on Gas Plant | NAOC | Kwale | Completed |
1997 | Repair of Weld Failure on FCC Unit | Port Harcourt Refinery | Port Harcourt, River State | Completed |